工業环氧地坪的保護九項原則?
1、环氧坪地施工完畢後需養護3-7天後方可投入使用,在養護期間,應避免水或其它溶液浸潤表面;2、凡進入車間員工必須要換成膠底鞋(以免將外面的泥沙帶入車間而劃傷地面);拋光混凝土地面和环氧地坪都是工業級环氧地坪新技術
1. The epoxy floor should be maintained for 3-7 days before it can be put into use. During the maintenance period, water or other solutions should be avoided to infiltrate the surface. 2. All employees entering the workshop must be replaced with rubber soles (so as not to bring the outside sediment into the workshop and scratch the floor). Polished concrete floor and epoxy floor are new industrial floor technology.
3、凡是硬件:如鐵椅、鐵桌、鐵貨架等,須將其腳用軟質塑料、橡膠包裹或用紙皮墊起來以免在使用過程中劃傷地面;
3. Hardware: such as iron chairs, iron tables, iron shelves, etc., should be wrapped with soft plastic, rubber彩色沥清地坪 or paper pads to avoid scratching the ground during use.
4、拖拉機扳需充分將機板升離地面,轉彎時請特別註意機板角切勿刮傷地面;
4. The tractor puller should lift the machine board off the ground sufficiently. When turning, please pay special attention to the angle of the machine board so as not to scratch the ground.
5、清潔地面時請用軟質吸水性好的拖把或幹濕兩用吸塵器,可用清水或清潔劑清洗,但請註意地面濕滑;
5. W透水地坪hen cleaning the ground, please use a soft mop with good water absorption or a wet-dry dual-purpose vacuum cleaner, which can be cleaned with clean water or detergent, but please pay attention to the wet and slippery ground.
6、若因使用時間較長而造成磨損或刮花、小面積可進行局部修補,若面積較大則建議重新滾塗一次;
6. If wear or scratch is caused by long service time and small area can be repaired locally, if the area is large, it is recommended to re-roll coating once.
7、 設備進廠前,在环氧地坪上鋪上硬紙箱墊底,以免在運輸設備過程中刮傷地面;
7. Before the equipment enters the factory, lay cardboard boxes on the floor so as not to scratch the ground in the process of transportation equipment.
8、 推車,板車之車輪請用硬質或彈性膠輪,並廠房內外分開使用;
8. The wheels of the cart should be rigid or elastic, and be used separately inside and outside the workshop.
9、 可根據地面要求做打蠟處理(其效果可防止地面刮傷)。
9, waxing can be done according to the ground requirements (the effect can prevent ground scratches).