關於环氧地坪日後的保養與維護問題
不少在剛鋪設好的环氧地坪的廠傢都會憂心晚期如何愛護,覺得正確的愛護可以晉升產物的運用功能,並且能拉長环氧地坪的運用壽命,現在在運用嘉興环氧地坪的企業大多數都是廠房或許是車庫之類的,因而正確的調養是相當緊要的,這樣不單單隻是波及到瞭企業的制作,更緊要的是可能會波及到企業的經濟.
Many manufacturers who have just laid epoxy flooring worry about how to care for them in the late stage. They think that correct care can promote the use of products and prolong the service life of epoxy flooring. Now most of the enterprises using Jiaxing epoxy flooring are factories or garages, so correct maintenance is very important. This will not only affect the production of enterprises, but also the economy of enterprises. 當环氧地坪剛才在投入運用的時辰,一開真的應用無法讓載重輛大的車輛在上頭局面,由於一開真的時分环氧地坪的百般功能還沒有發揚到最大的情況,於是一開端在應用的時分肯定要謹小慎微的,等一段時光事後就可以定心應用瞭.
When the local floor was put into use just now, the first real application can't let the heavy-duty vehicles in the top situation. Because the various functions of the ground floor have not been developed to the 印花地坪greatest extent when the real application is launched, it must be cautious at the beginning of the application. After a period of time, it can be applied carefully.
要急事消除掉地坪上頭的雜物,在應用過程中的時分未免會讓地坪受到油漬、水漬乃至帶有腐蝕性的化學藥品或許溶劑等等的打擾,若是上頭弄上這些器材的話應該趕緊辦理掉.
To eliminate the debris on the floor urgently, the floor will be disturbed by oil stains, water stains, even corrosive chemicals or solvents, etc. in the course of application. If you get these equipment on the top, you should deal with them as soon as possible.
要關註趕緊修補紕漏當地坪出現損壞,應趕緊修補,防止污染物資進路塗膜以及混凝土裡面,一旦污漬進路裡面並固執的與地層相關,將加大返修難度.
Attention sho环氧地坪uld be paid to repairing the leaks and damage to the local floor. Repair should be done as soon as possible to prevent contaminants from entering the coating and concrete. Once the stains are in the road and are stubbornly related to the stratum, it will be more difficult to repair them.
愛護环氧地坪 环氧地坪陸地施工完約4小時,即起始實行澆水愛護,防止混凝土因水份的訊速蒸發出現開裂現象,並防止輕微的污染.水愛護起碼延續7天,需確保混凝土表面呈延續潮濕情況.
After about 4 hours of construction, the epoxy floor will be watered to prevent concrete from cracking due to moisture evaporation and slight pollution. Water protection lasts for at least 7 days to ensure that the surface of concrete is wet.