环氧耐磨地坪廠傢分析影響地坪效果的因素
环氧地坪的種類有很多,並且环氧地坪具有很多優點,如环氧地坪表面光潔幹凈,平整耐磨等,因此被廣泛的應用於各個場合。此外,用戶可以根據不同的場地,不同的要求,選擇不同的地坪。雖然地坪有很多優點,但是想要達到很好的效果,在施工時也要格外的註意,下面將由环氧耐磨地坪廠傢簡單的分析一下影響地坪效果的因素有哪些。
There are many kinds of epoxy floor, and the floor has many advantages, such as clean surface, smooth and wear-resistant, so it is widely used in various occasions. In addition, users can choose different floors according to different venues and requirements. Although the floor has many advantages, but in order to achieve good results, special attention should be paid to the construction. Here will be a brief analysis of the factors affecting the floor effect by the epoxy wear-resistant floor manufacturers.
1、地面水分的情況及影響:环氧地坪對地面水分的要求比較高,泥地面的水分必須小於7%,而且對於地勢較低、地下水位較高的一層地面,原則上必須做防水處理。如果車間水泥地面未進行防水處理,或在水泥地面施工後很快進入瞭秋冬季節,地面水分含量較高,在這種情況下,如果進行环氧地坪施工,因為环氧地坪表面致密、無透氣性,地面不斷滲出的微量水分會破壞地坪與水泥地面之間的結合力,久而久之,地坪容易出現鼓包、起層、開裂等問題。
1. The situation and influence of surface water: epoxy floor has a high requirement for surface water, and the water content of cement floor must be less than 7%. In principle, waterproof treatment must be done for a layer of ground with low terrain and high groundwater level. If the workshop cement floor is not waterproofed or soon enters the autumn and winter season after the construction of the cement floor, the ground moisture content is higher. In this case, if the epoxy floor is constructed, because the surface of the epoxy floor is dense and impermeable, the continuous seepage of trace moisture from the ground will destroy the floor and cement floor. The bonding force between the floor and the floor tends to be bulging, cracking and cracking.
2、环境溫度對地坪的影響:無溶劑环氧自流平地坪對环境溫度的要求很嚴格,环境溫度低於15℃時,地坪的固化就會非常困難。而且因為其不含溶劑,所以不容易加入一般的低溫固化促進劑,即使加入進口的低溫固化促進劑,也要求环境溫度必須在10℃以上方可施工。溶劑型环氧地坪一般要求施工溫度在15℃以上,在加入低溫固化促進劑後,施工溫度可以降至5℃左右。所以在施工以前10天至施工結束後5天的期間,施工現場的溫度就必須保持在10℃以上,並保證施工現場具有良好的通風條件,以利於水分揮發及地坪充分固化。
2. The influence of ambient temperature on the floor: Solvent-free epoxy self-leveling floor has strict requirements on the ambient temperature. When the ambient temperature is lower than 15 C, the solidification of the floor will be very difficult. And because it does not contain solvents, it is not easy to add general low temperature curing accelerators. Even if imported low temperature curing accelerators are added, the ambient temperature must be above 10 degrees Celsius before construction. Solvent-based epoxy flooring generally requires the construction temperature to be above 15 C. After adding low-temperature curing accelerator, the constru透水地坪ction temperature can be reduced to about 5 C. Therefore, during the period from 10 days before the construction to 5 days after the completion of the construction, the temperature of the construction site must be maintained above 10 C, and good ventilation conditions should be guaranteed in order to facilitate moisture volatilization and sufficient solidification of the ground.
3、地面平整度的影響:如果施工現場的地面平整度較差,落差超過5毫米以上時,地坪的平整度就不容易得到保證。雖然在地坪施工前可以采取地面打磨、補膩子等補救措施,但在進行3毫米以下厚度的地坪施工時,不能保證环氧地坪的平整。
3. The influence of ground smoothness: If the ground smoothness of the construction site is poor and the drop is more than 5 mm, the ground smoothness will not be easily guaranteed. Although remedial measures such as ground polishing and putty filling can be taken before the construction of the floor, the leveling of the epoxy floor can not be guaranteed during the construction of the floor with a thickness of less than 3 mm.
4、地面裂縫影響:施工現場的地面上存在的裂縫可以用环氧膩子進行灌註填平,但如果由於水泥本身的問題,將來出現新的較大裂縫,則地坪可能因此也出現裂縫,那麼這些裂縫隻能再從新進行修補。
4. The influence印花地坪 of ground cracks: The ground cracks in the construction site can be filled with epoxy putty, but if there are new and larger cracks in the future due to the problems of cement itself, the ground may also appear cracks, so these cracks can only be repaired from the beginning.
5、通風及灰塵的影響:施工現場應該保持良好的通風,否則會影響地坪的幹燥。施工現場的灰塵對地坪表面光澤、平整度有較大影響,所以施工現場應為相對封閉的場所,在地坪施工的同時,不應該再進行其它施工作業,無關人員不得進入施工現場。
5. The influence of ventilation and dust: The construction site should keep good ventilation, otherwise it will affect the drying of the floor. Dust on the construction site has a great impact on the surface gloss and smoothness of the floor, so the construction site should be a relatively closed place, while the floor construction, other construction operations should not be carried out, and irrelevant personnel should not enter the construction site.