如何在保證質量的情況下有效縮短环氧地坪的工

文章时间:2018-11-01 00:09:26   浏览次数:1112

很多工程尤其是大型工程都有工期安排和工期預計,必須在規定工期內完成环氧地坪項目,如何保證环氧地坪工期呢?① 組織一個以項目經理為首的權威現場施工領導班子,實行統一領導、統一管理、統一協調。② 制訂施工管理人員工作責任制,做到職責明確,獎罰分明。③ 抓好開工前施工準備工作,開工前先遣部分管理人員進場,做好與建設單位、總承包單位關於場地交接工作,及時落實好實際進場時間,熟悉施工現場环境。
Many projects, especially large-scale projects, have schedules and schedules. Epoxy floor project透水地坪s must be completed within the specified time limit. How to ensure the construction period of epoxy floor? (1) To organize an authoritative on-site construction leading group headed by the project manager, to implement unified leadership, unified management and unified coordination. Second, work out the responsibility system of the construction management personnel, so as to achieve clear responsibilities and rewards and penalties.
(3) Pay attention to the preparatory work of construction before the start of construction, advance some managers to the site before the start of construction, do a good job with the construction unit, general contractor on site handover work, timely implementation of the actual arrival time, familiar with the construction site environment.
④ 編好勞動力、施工機械、周轉材料計劃、合理組織計劃。
Fourth, compile labor force, construction machinery, turnover material plan and organize the plan reasonably.
⑤ 確保所有機械設備,周轉材料,主要材料的按時供應,杜絕因材料供應不及時而造成的不必要的怠工。
_To ensure the timely supply of all machinery and equipment, turnover materials and main materials, and to prevent unnecessary idling caused by the lack of timely supply of materials.
⑥ 強化通訊聯絡、交通運輸、施工整體調度等各種手段,高效、科學指揮施工。
_Strengthen communication and liaison, transportation, construction of the overall scheduling and other means, efficient and scientific command of construction.
⑦ 做好工序前的準備工作,在工序前由施工員負責落實各方面的準備工作,如工作面,施工機械,主要材料,技術復核和隱蔽工程檢驗等,並檢查落實。
_Preparatory work before the working procedure should be done well. Before the working procedure, the builder should be responsible for all aspects of preparatory work, such as working face, construction machinery, main materials, technical review and hidden engineering inspection, and check the implementation.
⑧ 實行邊施工邊檢查,進行全過程控制。采用分段分部位驗收,減少中間环節,有利於實行施工作業的開展,以縮短工期.
Carry out inspection along the construction side and carry out the whole process control. Adopting sectional and partial acceptance to reduce intermediate links is conducive to the implementation of construction operations and shorten the construction period.
隻有嚴格執行施工組織設計,才能確保按時竣工。擁有強大的管理團隊和施工團隊,能夠在最短的時間內創造最大的價值
Only by strictly implementing the construction organization design can we ensure the completio环氧地坪n on time. With strong management team and construction team, it can create the greatest value in the shortest time.