混凝土密封固化劑施工價格有哪些因素決定
混凝土密封固化劑具有防塵、抗重壓、防潮、防黴等特點,被眾多工廠車間采用,得到眾多客戶的認可,但是有很多因素會影響混凝土密封固化劑的價格,那麼到底哪些因素會影響價格呢?如下:1、基材不同導致的用量:混凝土基材密實度不同會導致混凝土密封固化劑用量的差異,較疏松的基材固化劑用量會加大,而密實度較高的基材固化劑的用量會在理論用量之內,混凝土密封固化劑用量的不同造成主材成本的差異;
Concrete sealant has the characteristics of dust-proof, anti-gravity, moisture-proof, mildew-proof and so on. It has been adopted by many factories and workshops, and has been approved by many customers. But there are many factors that will affect the price of concrete sealant. So what factors will affect the price? The following: 1. The amount of concrete caused by different substrates: concrete. The different density of the base material will lead to the difference of the dosage of the concrete sealing curing agent, the more loose the dosage of the base material curing agent will increase, and the higher density of the base material curing agent dosage will be within the theoretical dosage, the different dosage of the concrete sealing curing agent will cause the difference of the cost of the main material.
2、基材不同導致的打磨成本:混凝土基材的平整度、密實度都會對打磨成本造成較大的影響,通常平整度和密實度較好的基材打磨成本會降低,反之會升高,舊地面翻新也會因為不同表層的處理方式而增加成本;
2. The grinding cost caused by different base materials: the smoothness and compactness of concrete base materials will have a greater impact on the grinding cost. Usually, the grinding cost of the base materials with better smoothness and compactness will be reduced, otherwise it will be increased, and the cost of the old ground renovation will be increased because of different surface treatment methods.
3、基材不同導致的修補成本:地面裂縫較多需要專門的研補材料和打磨工藝就會增加成本,地面坑洞較多,需要使用地面專用水泥等進行修補,甚至整體覆蓋,這會大大增加成本;地面起砂厲害就需要進行增硬處理,成本會大幅增加,所以對基材的研判是非常重要並且需要專業的方法,否則會面臨意想不到的成本增加或者不能完美交工;
3. Repair costs due to different substrates: more ground cracks require special patching materials and grinding process will increase costs, more ground pits, the need to use ground-specific cement for repair, or even overall coverage, which will greatly increase costs; the ground needs to be hardened to deal with severe sand, the cost will be high Increased amplitude, so the judgment of the substrate is very important and requires professional methods, otherwise will face unexpected cost increases or not perfect delivery;
混凝土密封固化劑地坪
Concrete seal curing agent floor
4、用戶對效果的要求:用戶對最終效果的要求也是成本變化的因素,如果承接工程時溝通不到位造成對同一事體的不同理解,比如對光澤的要求較高就會增加研磨拋光的道數,成本也會增加;
4. User's requirement for effect: User's requirement for final effect is also a factor of cost change. If undertaking the project is not communicated properly, different understandings of the same subject will be created. For example, higher requirement for gloss will increase the number of grinding and polishing paths, and the cost will also increase.
5、施工工藝:合理的施工工藝是節約成本的最佳方式,工藝設置合理就能夠用最簡潔的工藝做出最優質的效果,工藝不合理會產生窩工、返工、修修補補,不僅增加成本,還可能導致質量問題;
5. Construction tech环氧地坪nology: Reasonable construction technology is the best way to save costs. Reasonable technology settings can make the best effect with the simplest technology. The unreasonable technology will produce nesting, rework, repair, not only increase costs, but also may lead to quality problems.
6、施工管理:施工管理也是很重要的成本因素,管理到位意味著最高的效率、最小的損耗、最短的工時、最少的浪費、最低的成本,反之會增加大量的成本;
6. Construction management: Construction management is also a very important cost factor, management in place means the highest efficiency, the smallest loss, the shortest man-hour, the smallest waste, the lowest cost, otherwise will increase a lot of costs;
7、施工印花地坪設備的維護成本:施工設備的維護成本也是不得不考慮的一個成本因素,如果設備使用不當導致更換配件、縮短損耗件的使用壽命等,不僅會耽誤工時,同時也增加瞭零配件的支出;如果使用的打磨設備等質量不好經常需要維修也會大大增加工程的成本;
7. Maintenance Cost of Construction Equipment: Maintenance Cost of Construction Equipment is also a cost factor that must be considered. If the equipment is used improperly, it will not only delay the working hours, but also increase the expenditure of spare parts; if the quality of the used grinding equipment is not good, it is often needed. Maintenance will also greatly increase the cost of the project.
8、人工:人工的問題不做贅述,訓練有素、職業素養高的工人及施工管理人員一定能夠在每個环節節約成本,人是最萬能的,既能節約也就能損耗,所以對施工人員的培訓及管理是最重要的。
8. Manpower: The problem of labor does not need to be elaborated, well-trained, highly professional workers and construction management personnel must be able to save costs in each link, people are the most versatile, both can save and can be depleted, so the training and management of construction personnel is the most important.