從哪些方面考慮环氧地坪施工的經費預算

文章时间:2018-10-17 00:04:27   浏览次数:1128

环氧地坪施工經費是每一個公司都比較關註的一個問題,特別是一些大企業在做环氧地坪項目的時候,動輒上千平方的場地裡鋪設环氧地坪價格肯定會比較高,這就需要公司的采購對地坪施工經費的預算比較瞭解,華彩地坪總結瞭一些關於地坪施工的經費預算要考慮的項目,給大傢做一下參考:
Epoxy floor construction funds is a problem that every company pays close attention to. Especially when some large enterprises are doing floor projects, the price of paving the floor in thousands of square meters is sure to be higher. This requires the company's purchasing to know more about the budget of floor construction funds. The colorful floor summarizes some. As for the budget for the construction of the terrace, we should give you some reference:
环氧地坪
Epoxy floor
(1)工程量:依照施工定額劃定的工程項目和施工圖的要求盤算的分項、分層、分段的差別工種的用工量,最後總結成單元工程的總用量及人工費。
(1) Quantity: According to the construction quota of the project and the requirements of the construction drawings to calculate the amount of work for different types of sub-items, layers, sub-sections, and finally summarized into the total amount of unit projects and labor costs.
(2)人工數目:憑據分項、分層、分段工程量實時間定額,盤算出分項、分層、分段的差別工種的用工量,最後總結成單元工程的總用量及人工費。
(2) Number of labor: According to the real-time time quota of the quantities of sub-items, layers and sub-sections, the quantities of different types of labor for sub-items, layers and sub-sections are calculated. Finally, the total quantities and labor costs of the unit projects are summarized.
(3)材料用量:憑據分項、分層、分段工程量及环氧地坪施工定額劃定的材料用量,盤算出分項、分層、分段的需用量。然後逐項匯總成單元工程需用的質料用量,並按質料單價盤算出單元工程材料費。
(3) Material dosage: According to the amount of materials demarcated by subentry, stratification, subdivision and epoxy floor construction quota, the amount of materials demanded by subentry, stratification and subdivision is calculated. Then the amount of materials needed for the unit project is summed up and the material cost of the unit project is calculated according to the unit price of the materials.
(4)彩色沥清地坪大中型機器的種類和施工數目:憑據施工方案的要求和分項工程量及機器臺班利用定額,盤算出單元环氧地坪工程所必要的機器臺班數目。
(4) Types and construction numbers of large and medium-sized machines: According to the requirements of construction schemes and the amount of sub-projects and the utilization quota of machine benches, the number of machine benches necessary for the unit epoxy floor project is calculated.
(5)降低施工成本:施工預算中的人工、質料、機器臺班數目是在施工圖預算的基層基礎上來決定地坪的性能、新工藝以及經設置裝備部署單元、計劃單元同意的公道化發起等因素盤算的。因此,在施工預算書中應附有相應的擬接納的技能步伐及公道化發起的內容,以確保施工職員及生產工人按這些步伐舉行施工,到達低落本錢的目標。
(5) Reducing construction costs: The number of manpower, materials and machine shifts in the construction budget is calculated on the basis of the grass-roots level of the construction plan budget to determine the performance of the floor, new technology and the establishment of equipment deployment units, planning units agreed to the launching of a fair an印花地坪d other factors. Therefore, the construction budget should be accompanied by the appropriate pace of skills to be accepted and fair initiative to ensure that construction staff and production workers in accordance with these pace of construction, to achieve the goal of low cost.
最後總結其實就是把所有的費用都算進去,得出每平方需要的經費有多少,這樣就可以來計算總價瞭,其實這樣工作是施工方的主要任務,用戶可以提出自己的施工要求以及預算范圍,施工方要計算出最合理的方案。
Finally, the conclusion is actually to calculate all the costs, get the amount of funds required per square meter, so you can calculate the total price, in fact, this is the main task of the construction side, users can put forward their own construction requirements and budget range, the construction side to calculate the most reasonable scheme.