現在又到瞭一年一度的梅雨季節,梅雨季節裡,空氣濕度大、氣溫高,衣物等容易發黴,在如此潮濕的环境中,如何把环氧地坪施工好,是每個环氧地坪施工單位應該考慮的問題。在這種天氣中,环氧地坪施工常常會出現一些問題,例如地坪漆會出現發白、氣泡問題;或者施工完的地面起皺,因此在梅雨季節進行施工需要註意很多事項,那麼在梅雨季節,环氧地坪施工有沒有什麼好的方法呢?梅雨季節地坪施工出現問題一:在雨季時,因為氣壓比較低,很多有害物質會殘留在室內或裝飾裝修材料之中,不輕易揮發。陰雨天時不僅空氣濕潤,而且施工場地空氣活動也比較緩慢,因此施工中要將所有的門窗都打開,以保持室內良好的透風。這樣不僅有利於施工職員的身體健康,而且有助於地面等的盡早幹燥。
Now it's the annual Meiyu season. During the Meiyu season, the air humidity is high, the temperature is high, and the clothes are easy to mildew. In such a humid environment, how to construct the epoxy floor well is a problem that every floor construction unit should consider. In this kind of weather, there are often some problems in floor construction, such as bleaching and bubbles of floor paint, or wrinkling of the ground after construction, so a lot of matters need to be paid attention to during the Meiyu season. So, in the Meiyu season, is there any good method for epoxy floor construction? In the rainy season, there are problems in floor construction. First, in the rainy season, because the air pressure is relatively low, many harmful substances will remain in the interior or or decoration materials, not easil印花地坪y volatilized. In rainy days, not only the air is wet, but also the air activity in construction site is relatively slow. Therefore, all doors and windows should be opened during construction to maintain good indoor ventilation. This is not only conducive to the health of construction staff, but also conducive to the early drying of the ground and so on.
梅雨季節地坪施工出現問題二:在雨季施工,可能會造成油漆發白。墻面輕易形成水汽,刷漆、刮膩子也都不輕易幹燥。當膩子沒有幹透就進行油漆噴塗時,也輕易泛起題目,好比造成日後起泡、開裂等現象。刷漆盡量避開雨天,假如無法避開,那就要多透風,等第一遍刷完幹透後,再刷第二遍。此外,可在油漆中加入白化水調和劑等,加速幹燥。在墻面刮膩子前,可用幹佈將濕潤水汽擦幹。
In the rainy season, there are two problems in the floor construction. The construction in rainy season may cause the paint to whiten. The wall is easy to form vapor, paint, scrape putty are also not easy to dry. When putty is sprayed without drying thoroughly, it is easy to cause problems, such as foaming and cracking in the future. Paint as far as possible to avoid rainy days, if you can not avoid, then more ventilation, until the first brush dry, then brush the second time. In addition, whitening water mixer can be added to paint to accelerate drying. Before scraping putty on the wall, wet water vapor can be dried with dry cloth.
梅雨季節地坪施工出現問題三:地板起翹,專傢建議出現這種問題的時候,要對鋪設地板的水泥地坪要保持幹燥,幹濕接壤處要采用有效的隔斷處理方法。鋪地板時應采用防潮膜以便隔離潮氣,地板鋪設完工後,有前提的宜在隱蔽處留透氣孔。要根據地板樹種、含水率及空氣濕度來決定鋪設工藝,不亂性差的樹種需開包平衡時間長達72小時。
During the rainy season, there are three problems in floor construction: floor heave. Experts suggest that when this problem occurs, the cement floor should be kept dry, and the effective partition treatment method should be adopted at the dry-wet junction. When laying the floor, damp-proof film should be used to isolate moisture. After the floor is laid, it is preferable to leave ventilation holes in concealed places if necessary. The paving process should be decided according to the floor tree species, moisture content and air humidity. The unbalanced tree species need to be unbalanced for up to 72 hours.
梅雨季節地坪施工出現問題四:梅雨季節木制品的含水率往往高於這個百分比,這樣在幹燥季節輕易泛起木制品開裂、起翹等現象。選購人造板材時,盡量選購近幾個月出產出來的,這樣的木制品經由瞭幹燥處理,接觸濕潤空氣的時間相對更少,含水率不高。與此相反,選擇木龍骨類材料時,則最好選擇“陳品”,而且沒有在露天存放過的,這樣的龍骨含水率會低一些。施工前,最好把木制品包裝打開晾一會,讓材料和室內的含水率接近。地板起翹,專傢建議出現這種問題的時候,要對鋪設地板的水泥地坪要保持幹燥,幹濕接壤處要采用有效的隔斷處理方法。鋪地板時應采用防潮膜以便隔離潮氣,地板鋪設完工後,有前提的宜在隱蔽處留透氣孔。要根據地板樹種、含水率及空氣濕度來決定鋪設工藝,不亂性差的樹種需開包平衡時間長達72小時。
There are four problems in floor construction in Meiyu season: the moisture content of wood products in 彩色沥清地坪Meiyu season is often higher than this percentage, which easily causes cracking and warping of wood products in dry season. When choosing wood-based panels, try to purchase the products produced in recent months. Such wood products have been dried, and the contact time with wet air is relatively less, and the moisture content is not high. On the contrary, when choosing wood keel materials, it is better to choose "old products", and not stored in the open air, such keel moisture content will be lower. Before construction, it is better to open the wood packaging and air it for a while, so that the material and indoor moisture content are close. Floor warping, experts suggest that when this problem arises, to lay the floor of the cement floor to keep dry, dry and wet junctions to use effective partition treatment. When laying the floor, damp-proof film should be used to isolate moisture. After the floor is laid, it is preferable to leave ventilation holes in concealed places if necessary. The paving process should be decided according to the floor tree species, moisture content and air humidity. The unbalanced tree species need to be unbalanced for up to 72 hours.