解析环氧地坪漆的施工技巧有哪些?

文章时间:2019-02-24 12:41:49   浏览次数:1478

环氧地坪漆的施工技巧有哪些?环氧地坪漆表面處理 1、新竣工环氧地坪經過養護後方可施工,約28天。 2、清除环氧地坪表面水泥浮漿、粘附的垃圾雜物等。3、用清洗劑徹底清除表面油污。 4、清除積水,使潮濕處徹底幹燥。 5、清理伸縮縫,灌漿將伸縮縫填充平整,在伸縮縫處粘貼寬度250px左右的玻璃纖維1道。6、用無塵清掃機及吸塵器清潔地表。 7、环氧地坪表面用無塵打磨機打磨,並用吸塵器徹底清潔。8、环氧地坪表面有洞孔和明顯凹陷處用膩子來填補,實幹後,打磨,吸塵。平整度要求小於3MM。
What are the construction techniques of epoxy floor paint? Surface treatment of epoxy floor paint 1. The newly completed epoxy floor can be constructed after maintenance for about 28 days. 2. Remove cement slurry and adhering garbage and other debris on the surface of epoxy flooring. 3. Clean the surface oil with cleaning agent thoroughly. 4. Clean up the accumulated water and make the wet place thoroughly dry. 5. Clean up the expansion joint, fill the expansion joint smoothly with grouting, and paste a glass fiber channel with a width of about 250 PX at the expansion joint. 6. Clean the surface with dust-free sweeper and vacuum cleaner. 7. The surface of the floor is polished with a dust-free grinder and cleaned thoroughly with a vacuum cleaner. 8. Putty is used to fill holes and obvious depressions on the surface of the floor. After drying, polish and dust. The flatness requirement is less than 3MM. 塗飾封閉塗透水地坪料
Finishing Sealing Coatings
1、在處理清潔,平整的地坪表面滾塗环氧封閉底塗料一道。
1. Roll an epoxy sealing primer on the clean, flat surface of the floor.
2、在第一道环氧封閉底漆實幹後,滾塗第二道环氧封閉底漆。
2. After the first epoxy sealing primer is dry, the second epoxy sealing primer is rolled on.
3、局部漏塗可用刷子補塗,表面多餘的底漆必須在下道工序施工前打磨處理好。
3. Partial leakage can be repaired with brushes. Surface superfluous primer must be polished before construction of the next process.
批刮环氧膩子
Batch scraping epoxy putty
1、用环氧批刮料和石英砂作為第一道膩子,充分攪拌均勻,刮平。
1. Use epoxy batch scraper and quartz sand as the first putty, mix well and scrape flat.
2、用無塵打磨機打磨第一道膩子,並吸塵清潔。
2. Grind the first putty with a dust-free grinder and clean it with vacuum.
3、第一道膩子實幹後,用环氧批刮料和石英砂作為第二道膩子,充分攪拌均勻,刮平。
3. After the first putty is dry, use epoxy batch scraper and quartz sand as the second putty, mix well and scrape flat.
塗飾环氧面漆2遍
Paint epoxy topcoat twice
1、在中間層實幹後,對中間層進行打磨、吸塵。
1. After the middle layer is dry, polish and dust the middle layer.
2、進行环氧地坪面漆滾塗。
2. Rolling coating of epoxy floor finish.
3、第一道环氧面漆滾塗後,如存在氣泡現象應用消泡滾筒,在地坪上來回滾動最後讓其自行流平即可。
3. After rolling the first epoxy finish, if there are bubbles, the defoaming drum should be used to roll back and forth on the floor and eventually let it leveled by itself.
4、在第一道环氧面漆實幹後,進行第二道环氧面漆滾塗。
4. After the first epoxy finish is dry, the second epoxy finish is rolled.
畫線
Draw line
1、环氧地坪施工結束後按圖紙指定的區域地點彈線。
1. The bullet line of the designated area after the epoxy floor construction.
2、在規定的畫線區域粘貼紙膠帶。
2. Stick paper tape in the prescribed drawing area.
3、用細砂紙將膠帶內的區域打磨,使其粗糙。
3. Use fine sandpaper to grind the area inside the tape to make it rough.
4、用滾桶將指定顏色的环氧樹脂面漆塗刷到表面。
4. Apply epoxy resin topcoat of specified color to the surface with a drum.
地坪漆安全技術要求:
Safety Technical Requirements for Floo印花地坪r Paint:
1、施工場地四周應拉好警戒帶和掛好警告牌。
1. Alert belts and warning signs should be put up around the construction site.
2、施工場地四周10米內嚴禁明火作業,嚴禁吸煙。
2. Open fire operation and smoking are strictly prohibited within 10 meters around the construction site.
3、塗料和稀釋劑應放在通風良好的庫房內。
3. Coatings and diluents should be placed in well-ventilated warehouses.
4、工作時註意做好個人防護。
4. Pay attention to personal protection while working.
5、電動工具的使用須有專人負責,做完離場前切斷電源。
5. The use of electric tools should be handled by a special person, and the power supply should be cut off before leaving the field.